This hospital-location has already been demolished. Because of uncovering asbestos the clearing of the building is halted. This period took a long time.
On the roof we were able to make great shots of the environment. Many departments were stripped and lot of rubbish was dumped in the patientrooms. On several places some old-school equipment can be found. We also noticed that on several departments, devices and elevators still was left electrical power!